PLMVendors

Article 15 of 15 in Selection & Implementation · PLMV-KB-053 · Rev. A · Reviewed 2026-11-04

Common PLM Selection and Implementation Mistakes

Short answer

The most common PLM mistakes are selecting from feature checklists instead of scenarios, starting without a data owner, watching demos on vendor data, scoping a big-bang rollout, leaving migration late, over-customising, and neglecting adoption and governance after go-live. Each has an early sign and a practical fix.

Key takeaways

  • Selection mistakes come from comparing feature lists and vendor demos instead of the buyer's own scenarios and data.
  • Implementation mistakes come from scope that is too wide, migration left late and customisation that raises upgrade cost.
  • Post go-live mistakes come from missing training, retained spreadsheets and no owner for product data.
  • Published sources give no verified failure rate, so the register quotes none.

What are the most common PLM mistakes?

Publications from Aras, Arena and the Dassault partner TECHNIA, all vendor-side sources, name overlapping lists: unclear requirements, missing executive support, poor change management, weak integration planning, dirty data and thin training. None of them quotes a failure rate, and the register quotes none. The register groups the mistakes by project stage below, and the closing table pairs each with an early sign and a fix.

Mistakes during selection

Selection mistakes are cheapest to fix, because nothing is configured yet. They also shape every later phase, since requirements, shortlist and contract all rest on the same assumptions.

  • Feature checklists without scenarios. A checklist rewards the longest list of ticks. Aras warns that functions are sometimes oversold and that vendor best practice may not fit the buyer's processes. Scripted scenarios test fit instead.
  • No named data owner. Part numbering, BOM structure and release rules need one accountable person before any vendor configures them.
  • Demos on vendor data. A polished demonstration shows the vendor's data model. Sample data from the buyer's own products exposes gaps early.
  • Price-only comparison. TECHNIA notes that decisions driven by sales pitches, popularity or price can pick a system that does not match workflows. Compare cost over the full term, as in how much PLM software costs.
  • Requirements written by a small group. Aras describes software imposed on users who were not involved, which invites resistance. Workshops across engineering, manufacturing, quality and purchasing widen the input.

Mistakes during implementation

Implementation mistakes tend to appear as schedule slips and rework. Most trace back to a decision made during selection that nobody revisited.

  • Big-bang scope. Arena lists implementing too fast among its adoption mistakes and suggests phases that start with core BOM, change and document management.
  • Migration left late. Profiling and cleansing take calendar time, and Arena notes that poor inputs give poor results.
  • Over-customisation. Each extension adds to the cost of every later upgrade.
  • Integration planning left to the end. Arena and TECHNIA both describe data silos when ERP, CAD and other links are planned late.
  • No executive sponsor. Aras points to leaders who expect a quick fix and lose patience.
  • Unclear goals. TECHNIA lists unrealistic expectations that the system will solve everything on its own. Specific, time-bound objectives tied to named pain points give the team something to test at each phase.

Mistakes after go-live

A release that works technically can still fail to change daily work. The signs show in how engineers, buyers and quality staff behave in the months after launch.

  • Retained spreadsheets. Arena lists old habits as a mistake. Teams keep using spreadsheets and paper unless the old routes are closed.
  • Training that stops at go-live. Role-based training for internal users and external partners continues after each release.
  • No governance. Without a change board and data stewards, part records drift and the migration effort is wasted.
  • No measurement. TECHNIA suggests tracking indicators such as development time and product quality. Track usage and data quality alongside them.

How can these mistakes be avoided?

MistakeEarly signFixRelated article
Checklist-only selectionVendors score alike on paperScripted scenarios on own dataVendor demo scenarios
Unclear scope and processRequirements change every weekWritten requirements, then a shortlistHow to select a PLM system
Late migrationNo profiling report at kickoffProfile and clean during selectionPLM data migration
Low adoptionSpreadsheets still circulateRole training, retire old routesPLM user adoption
Over-customisationMany custom scripts in the design workshopConfigure first, log each deviation and its upgrade effectSoftware cost
Big-bang rolloutOne go-live date for every sitePhased releases with exit criteriaPLM implementation roadmap

Use the table as a review checklist at each stage gate, with the project sponsor, the data owner and the key users each signing off their own rows. A mistake caught at selection costs a rewritten requirement. The same mistake caught after go-live costs rework in configured processes and migrated data.

Frequently asked questions

What is the most common reason PLM projects struggle?

Vendor and partner publications name several overlapping causes: unclear requirements, weak executive support, poor change management, dirty data and thin training. No source checked here gives a verified failure rate, so the register does not rank the causes. A written requirement set and a named data owner address the earliest ones.

When should migration planning start?

During selection. Data profiling shows how many duplicate parts, missing attributes and orphaned documents exist, and that volume affects scope, schedule and vendor quotes. Waiting until configuration ends leaves too little time for trial loads and validation, which are repeated several times before go-live.

How can a team avoid over-customising a PLM system?

Configure standard capabilities first, record every deviation with a business reason, and review each extension for its effect on later upgrades. Compare vendors on how upgrades treat customisation. Fewer extensions mean lower run cost and an easier path to new releases.

Sources

Revision history

Rev.DateSummary
AInitial release.

Written by Nathalie Paniuta. Reviewed 4 November 2026 by the PLM Vendors editorial team. Regulatory dates and vendor details change; check the sources for the latest position. Corrections with a source: info@plmvendors.com.

Continue in Selection & Implementation

Related articles